通信人家园

 找回密码
 注册

只需一步,快速开始

短信验证,便捷登录

搜索

军衔等级:

  下士

注册:2004-2-6
跳转到指定楼层
1#
发表于 2015-10-12 09:14:24 |只看该作者 |正序浏览
This document describes the Performance Management (PM) part of the
Operation and Maintenance (O&M) system for the Ericsson Long Term
Evolution (LTE) system.
It covers high-level description of the PM architecture, the mechanisms, and
the administrative support for the following PM measurement types:
• PM statistics, counter based measurements
• PM recordings, User Equipment (UE) Trace and Cell Trace
Descriptions of the counters can be found in theManaged Object Model RBS
and theCounter List. The events are described in the PM Event List.

Performance Management.pdf

1.52 MB, 下载次数: 11

性能管理

举报本楼

本帖有 1 个回帖,您需要登录后才能浏览 登录 | 注册
您需要登录后才可以回帖 登录 | 注册 |

手机版|C114 ( 沪ICP备12002291号-1 )|联系我们 |网站地图  

GMT+8, 2024-12-1 15:40 , Processed in 0.102474 second(s), 18 queries , Gzip On.

Copyright © 1999-2023 C114 All Rights Reserved

Discuz Licensed

回顶部